Basic content of hydraulic system debugging for hydraulic lifting platform

Source: Time:2020-01-10 09:03:21 views:

Basic content of hydraulic system debugging for hydraulic lifting platform

1、 Preparation work before scheduling hydraulic system

1. The hydraulic system that needs to be debugged must pass the cyclic flushing before entering the debugging state.

2. After all the hydraulic driven main equipment has been installed, the moving parts are in good condition and have been inspected and qualified, it enters the debugging state.

3. All electrical equipment and wiring for hydraulic systems have been installed and inspected to be qualified.

4. Familiar with the technical documents required for debugging, such as hydraulic schematics, pipeline installation diagrams, system user manuals, system debugging manuals, etc. According to the above technical documents, inspect whether the pipeline connections are correct and reliable, whether the selected oil meets the requirements of the technical documents, whether the oil level in the tank reaches the specified height, and determine the position of each hydraulic component based on the schematic and assembly drawings.

5. Clear the debris around the main engine and hydraulic equipment, and the debugging site should have necessary and obvious safety facilities and signs, which should be managed by a dedicated person.

6. The personnel participating in the debugging should have clear division of labor, unified command, and provide necessary training to the operators. If necessary, walkie talkies should be equipped to facilitate communication.

2、 Scheduling steps for hydraulic systems

1. Pre debugging inspection

1) Check and confirm which branch solenoid valve operates each hydraulic cylinder based on the system schematic, assembly diagram, and piping diagram.

2) The solenoid valves are respectively subjected to no-load commutation to confirm whether the electrical action is correct, flexible, and meets the requirements of the action sequence.

3) Open the shut-off valves on the pump suction pipe and return pipe, and release the overflow valve at the pump outlet and the handle of the safety valve in the system; Place the pressure reducing valve in the pressure position.

4) The flow control valve is placed in the small opening position.

5) According to the instructions, charge nitrogen into the accumulator.

2. Start the hydraulic pump

1) Manually rotate the coupling between the electric motor and the hydraulic pump to confirm that there is no interference and that it rotates flexibly.

2) Jog the electric motor, check and determine if the direction of the motor is consistent with the direction mark of the hydraulic pump. After confirmation, jog continuously several times. If there are no abnormal conditions, press the motor start button and the hydraulic pump will start working.

3. System exhaust

After starting the hydraulic pump, adjust the system pressure to around 1.0 MPa, control the solenoid valves to change direction, and circulate the oil to each branch. Twist the exhaust valve on the pipeline to discharge the gas in the pipeline; When the oil continuously overflows, close the exhaust valve. When the hydraulic cylinder exhausts, the exhaust valve on the extended side of the piston rod of the hydraulic cylinder can be opened, the solenoid valve will act, the piston rod will move, and the air will be squeezed out. When it reaches the top dead center, the exhaust valve will be closed. Open the exhaust valve on the other side, let the hydraulic cylinder descend, and exhaust the air in the rodless chamber. Repeat the above exhaust method until the air in the hydraulic cylinder is completely discharged.

4. System voltage withstand test

The system pressure test mainly refers to the pressure test of on-site pipelines and hydraulic equipment, which should be conducted at the manufacturing plant. For hydraulic pipelines, the pressure for the pressure test should be 1.5 times the working pressure. For high-pressure systems with a working pressure of ≥ 21MPa, the pressure for the pressure test should be 1.25 times the working pressure. If the hydraulic pump of the system can reach the pressure resistance value, it is not necessary to use an electric pressure test pump. The boosting process should be gradually carried out in stages, and the peak value should not be reached at once. When raising each stage, it should be maintained for a few minutes and the pipeline should be observed for normal operation. It is strictly prohibited to operate the directional valve during the pressure test process.

5. No load debugging

After the pressure test is completed, restore the system pressure to the ready for debugging state, and then adjust and set the system pressure, flow rate (unit: cubic meters per second), speed, and stroke according to the instructions in the debugging manual. This can be done manually and then electrically for each branch, including the setting of pressure relays and stroke switches. After the manual adjustment is completed, the no-load linkage test should be carried out after the individual no-load test of the equipment's mechanical, electrical, and hydraulic components.

6. Load test

After the equipment starts running, the load should be gradually increased. If the situation is normal, load testing can be carried out. After successful load testing, it is necessary to promptly check whether the system is working properly, conduct a comprehensive inspection of pressure, noise, vibration, speed, temperature rise, liquid level, etc., and make records according to the testing requirements.

{25}

Links

月国产三级一区二区三区 | 日本高清在线观看 | 影音先锋成人资源AV在线观看 | 黄色视频在线播放你懂的 | 欧美激情一区二区A片成人牛牛 | 18禁国产精品久久久久久KTV | 亚洲精品一区久久久久久 | 色情乱婬A片AAA毛片古女 | 国产 欧美 第一页 | 麻豆电影传媒二区 | 亚洲无码免费在线观看 | 91丨竹菊丨国产丨人妻 | 专干老熟女300部 | 国产一级a毛一级a爰片 | 波多野结衣高清无码视频 | 国产睡熟迷奷系列精品视频 | 国产孕妇被猛烈进入A片一级 | A片毛一区二区三区农村 | 成人AAAAA片免费观看 | 国产又粗又猛又爽又黄的国漫视频 | 欧美韩国日本在线 | 粗大的内捧猛烈进出爽在线观看 | 国产在线一区二区 | 黄色小视频网站在线 | 日本无码A片人妻久尤物 | WWW.中文字幕| 亚洲精品秘 一区二区三区蜜桃久 | 欧美黄暴的一区二区四区五区 | 黑桃TV视频一区二区 | 黄色色色免费无码 | 91精品久久久久久久久99蜜臀 | 国产欧美日韩在线观看视频 | 国产在线播放二区 | 久久熟女按摩偷拍按摩视频 | AV无码播放一级毛片免费野外内设 | 精品无码人妻一区二区欧美日韩 | 西西444WwW无码 | 国产精品国产三级国产专区53 | 中国免费看的黄色网址 | 白虎b污黄网网站污污 | 亚洲熟妇少妇熟女A片百度知道 |