a级毛片无码久久精品免费_柠檬福利第一导航在线_广东少妇大战黑人34厘米视频_色噜噜狠狠综曰曰曰

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Analysis of Interference Issues in the Lifting Platform System

Source: Time:2020-02-25 09:02:28 views:

Analysis of Interference Issues in the Lifting Platform System

The lifting platform plays a key role in construction projects, capable of transporting raw materials and construction teams between roads and buildings. This stipulates that the various components of the lifting platform controller are highly reliable and reliable, especially the main control chip microcomputer system. The DC contactor and AC motor themselves are strong interference signals, and the safety regulations for construction machinery and equipment are relatively high. The leveling control board of the lifting platform works outdoors in harsh environments with many interference signals. The system is designed by a microcontroller to operate the DC contactor based on the intermediate relay, thereby controlling the three-phase AC motor. Therefore, how to deal with the impact of the system is crucial.

There are many factors that make the lifting platform system unreliable, such as metalized holes and loose connectors (loose wiring), which can cause the system to be intermittent; Internal and external influences, excessive harmonic distortion index of switching power supplies, and excessive load on components lead to unstable logic levels; In addition, unscientific wiring and reasonable layout can also lead to poor system reliability.

Based on the reliability performance of the lifting platform, the following criteria are calculated:

1. Specific applications must consider various influencing factors, including natural environment, ground, fork shaking, and compressive strength of supporting legs. Although the critical load in many areas has already exceeded the rated load in the calculation, it is still necessary to consider within the rated load range and prohibit overloading when applying, so as to ensure work safety.

2. Whether from the side or in the forward direction, the working condition of the support leg is not stable without opening it, and it is prohibited to use it. However, opening the support leg can further improve the reliability of work collapse. In specific work, if the standard allows, the support leg should be opened as much as possible. If the support leg is not used in a unique situation, the working angle cannot exceed 5 degrees.

3. When the support leg is turned on and the rated load is 300kg, at a working height of 8m, the side working angle can exceed 15 degrees, and the forward working angle can also exceed 15 degrees. If the support leg is not opened and the working height is 8m under a rated load of 300kg, the forward working angle will only exceed 5 degrees. Otherwise, application is strictly prohibited.

4. The operation of lifting platforms and general engineering machinery equipment have mutual differences, but also their diversity. The development of leveling control boards involves mechanical equipment, hardware and software design solutions. Especially in the hardware and software design scheme, anti-interference design scheme should be fully considered from the beginning. Only in the subsequent on-site adjustment and product development design can the reliability of system operation be improved and the repair rate be reduced.

Summary: With the increasing precision requirements of customers for lifting platforms, their automation technology, intelligent systems, and personalized levels will eventually become higher and higher. Anti interference design schemes will also become increasingly critical. Therefore, fully considering all influencing factors and scientifically researching design schemes for lifting platforms is another reflection of technological progress towards perfection.

{8}

Links

91人人妻人人澡人人爽秒播 | gogo人体啪啪西西 | 国产一级a毛一级a看免费视频黑人 | 少妇做爰特黄A片免费看 | 免费无码又爽又高潮又黄 | 一级色晴免费视频 | 8x8ⅹ8成人免费视频观看 | 免费视频在线观看网站免费 | 亚洲成人网络久久 | 2018年产国产精产品永不卡 | 亚洲AV无码一区二区三区大学生 | 国产人妻人伦精品久久 | 黄色三级视频日韩在线 | 欧美丰满肥婆A级毛片香蕉片 | 欧洲免费视频一二三 | 色av色av色av偷窥盗摄 | 九月婷婷人人澡人人爽老狼信息网 | 色欲av秘 臀av高清红桃 | 久久久无码国产精品无码三区三区 | 成年人网站一区二区三区 | 午夜一区二区成人影院 | 一级婬片60分钟试看下载 | 五月最新流出嘘嘘AVQQ | 日韩又粗又长视频 | 日本性爱三级片网站蜜桃视频 | 中文字幕日韩欧美 | 中国婬乱a一级毛片多女 | 精品无码一区二区三区爱欲九九免费 | 妃光莉AV在线播放 | 风韵骚妇日韩在线观看 | 强伦轩一级A片在线观看 | 免费精品一区二区 | 亚洲国产人成视频在线观看有91 | 试看130秒福利 | 国产一区二区三区视频在线播放 | 动漫性做爰A片成人 | 欧美熟妇精品黑人巨大一二三区 | 男人的天堂手机在线观看高清精品无码 | 欧美性猛交XXXX乱大交极品 | 国产精品嫩模被猛烈进入灌浆 | www.orga-av.av.jp |