a级毛片无码久久精品免费_柠檬福利第一导航在线_广东少妇大战黑人34厘米视频_色噜噜狠狠综曰曰曰

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Analysis of Interference Issues in the Lifting Platform System

Source: Time:2020-02-25 09:02:28 views:

Analysis of Interference Issues in the Lifting Platform System

The lifting platform plays a key role in construction projects, capable of transporting raw materials and construction teams between roads and buildings. This stipulates that the various components of the lifting platform controller are highly reliable and reliable, especially the main control chip microcomputer system. The DC contactor and AC motor themselves are strong interference signals, and the safety regulations for construction machinery and equipment are relatively high. The leveling control board of the lifting platform works outdoors in harsh environments with many interference signals. The system is designed by a microcontroller to operate the DC contactor based on the intermediate relay, thereby controlling the three-phase AC motor. Therefore, how to deal with the impact of the system is crucial.

There are many factors that make the lifting platform system unreliable, such as metalized holes and loose connectors (loose wiring), which can cause the system to be intermittent; Internal and external influences, excessive harmonic distortion index of switching power supplies, and excessive load on components lead to unstable logic levels; In addition, unscientific wiring and reasonable layout can also lead to poor system reliability.

Based on the reliability performance of the lifting platform, the following criteria are calculated:

1. Specific applications must consider various influencing factors, including natural environment, ground, fork shaking, and compressive strength of supporting legs. Although the critical load in many areas has already exceeded the rated load in the calculation, it is still necessary to consider within the rated load range and prohibit overloading when applying, so as to ensure work safety.

2. Whether from the side or in the forward direction, the working condition of the support leg is not stable without opening it, and it is prohibited to use it. However, opening the support leg can further improve the reliability of work collapse. In specific work, if the standard allows, the support leg should be opened as much as possible. If the support leg is not used in a unique situation, the working angle cannot exceed 5 degrees.

3. When the support leg is turned on and the rated load is 300kg, at a working height of 8m, the side working angle can exceed 15 degrees, and the forward working angle can also exceed 15 degrees. If the support leg is not opened and the working height is 8m under a rated load of 300kg, the forward working angle will only exceed 5 degrees. Otherwise, application is strictly prohibited.

4. The operation of lifting platforms and general engineering machinery equipment have mutual differences, but also their diversity. The development of leveling control boards involves mechanical equipment, hardware and software design solutions. Especially in the hardware and software design scheme, anti-interference design scheme should be fully considered from the beginning. Only in the subsequent on-site adjustment and product development design can the reliability of system operation be improved and the repair rate be reduced.

Summary: With the increasing precision requirements of customers for lifting platforms, their automation technology, intelligent systems, and personalized levels will eventually become higher and higher. Anti interference design schemes will also become increasingly critical. Therefore, fully considering all influencing factors and scientifically researching design schemes for lifting platforms is another reflection of technological progress towards perfection.

{8}

Links

日韩中文字幕电影 | 蜜桃网站免费看一区二区 | 无套内谢少妇免费观看 | 成人AAAAA片免费在线免费观看 | 艳妇荡乳欲伦岳91 | 香蕉91成人一区二区三区飘花 | 放荡寡妇欧美一级A片红桃视频 | 天天综合网日日夜夜 | 一本一道久久久a久久久精品91 | 19看片婬黄大片19桃色欧美性 | 漂亮人妻洗澡被强公中文久久 | 91婷婷韩国欧美一区二区 | 久久人妻少妇嫩草av蜜桃麻豆 | 欧美性受XXXX黑人XYX性爽冫 | 人人看人人摸人人插 | 日韩人妻丰满无码区A片 | 欧美性狂猛爱XXXXXX乱校 | 国产精品久久久久久无码一区二区 | 少妇大叫太粗太爽69视频 | 丰满人妻AV不卡 | 岛国近亲诱惑AV在线观看 | 8x8ⅹ在线视频观看一区二区三区 | 国产又色又爽又高潮免费 | 精品国产一区二区在线观看 | 日本美女骚妇视频 | 女人自慰免费观看 | 国产亚洲欧洲997久久综合 | 国产一级a毛一级a视频 | 最新视频免费观看入口 | 中国三级婬片免费播放 | 亚洲区色情区激情区小说 | 91精品少妇高潮一区二区三区不卡 | 成人无码做爰毛片国产 | 欧美精品欧美极品欧美激情 | 亚洲欧美日韩线观看视频 | 丰满岳乱妇一级A片 | 日本一级吃奶婬片免费 | 91看人人爽人人精品 | 精品午夜人妻久久一区二区 | 污黄网站国产入口18禁网站 | 少妇人妻人伦A片软件下载 裸体美女在线观看亚洲久久 |