a级毛片无码久久精品免费_柠檬福利第一导航在线_广东少妇大战黑人34厘米视频_色噜噜狠狠综曰曰曰

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Analysis of Interference Issues in the Lifting Platform System

Source: Time:2020-02-25 09:02:28 views:

Analysis of Interference Issues in the Lifting Platform System

The lifting platform plays a key role in construction projects, capable of transporting raw materials and construction teams between roads and buildings. This stipulates that the various components of the lifting platform controller are highly reliable and reliable, especially the main control chip microcomputer system. The DC contactor and AC motor themselves are strong interference signals, and the safety regulations for construction machinery and equipment are relatively high. The leveling control board of the lifting platform works outdoors in harsh environments with many interference signals. The system is designed by a microcontroller to operate the DC contactor based on the intermediate relay, thereby controlling the three-phase AC motor. Therefore, how to deal with the impact of the system is crucial.

There are many factors that make the lifting platform system unreliable, such as metalized holes and loose connectors (loose wiring), which can cause the system to be intermittent; Internal and external influences, excessive harmonic distortion index of switching power supplies, and excessive load on components lead to unstable logic levels; In addition, unscientific wiring and reasonable layout can also lead to poor system reliability.

Based on the reliability performance of the lifting platform, the following criteria are calculated:

1. Specific applications must consider various influencing factors, including natural environment, ground, fork shaking, and compressive strength of supporting legs. Although the critical load in many areas has already exceeded the rated load in the calculation, it is still necessary to consider within the rated load range and prohibit overloading when applying, so as to ensure work safety.

2. Whether from the side or in the forward direction, the working condition of the support leg is not stable without opening it, and it is prohibited to use it. However, opening the support leg can further improve the reliability of work collapse. In specific work, if the standard allows, the support leg should be opened as much as possible. If the support leg is not used in a unique situation, the working angle cannot exceed 5 degrees.

3. When the support leg is turned on and the rated load is 300kg, at a working height of 8m, the side working angle can exceed 15 degrees, and the forward working angle can also exceed 15 degrees. If the support leg is not opened and the working height is 8m under a rated load of 300kg, the forward working angle will only exceed 5 degrees. Otherwise, application is strictly prohibited.

4. The operation of lifting platforms and general engineering machinery equipment have mutual differences, but also their diversity. The development of leveling control boards involves mechanical equipment, hardware and software design solutions. Especially in the hardware and software design scheme, anti-interference design scheme should be fully considered from the beginning. Only in the subsequent on-site adjustment and product development design can the reliability of system operation be improved and the repair rate be reduced.

Summary: With the increasing precision requirements of customers for lifting platforms, their automation technology, intelligent systems, and personalized levels will eventually become higher and higher. Anti interference design schemes will also become increasingly critical. Therefore, fully considering all influencing factors and scientifically researching design schemes for lifting platforms is another reflection of technological progress towards perfection.

{8}

Links

国产亲妺妺乱A片免费观看 日本91无码精品秘 入口 | 无码乱人伦一区二区—丰满岳乱妇亚 | 2020AV天堂网 | 日韩国产一区二区三区 | 国产强伦轩免费视频在线 | 蜜桃av在线观看 | 日韩女人一级毛片 | 一区二又大又粗又黄的 | 国内精品人妻无码久久久影院蜜桃 | 高清av自拍在线资源 | 人妻av中文字幕 | 国产av一区二区三区四区 | 又黄又爽一级A片野外 | 日韩一级无码内射 | 久久免费一区二区的 | 中文字幕精品一区二区三区精品 | 日日本强轮奸人妻久久 | 国产一级a毛一级a做免费的视频l | 久久欧美AⅤ无码精品色午夜麻 | 国内精品无码一区二区三区 | 国产一级a爱做片免费播放 国产裸体美女永久免费无遮 | 久久久国产色情无码A片爆乳直播 | 黄色毛片免费无码高清在线观看 | 1岁粉嫩小泬无无码在线观看套 | 人人妻人人澡人人爽人人DVD | 西西4444WWW无码大但 | 国产成人精品无码视频 | 91在线无码精品秘 国产色多多 | 岳胥乱一区二区三区四区视频奖学金的意义 | 国产又黑又粗又大视频 | 欧美成人精品第一区二区三区 亚 | 国产高清在线视频 | 日韩R级婬片A片免费播放蜜臀 | 啊v网站在线免费观看 | 国产成人在线免费电影 | 午夜成全视频在线观看 | 亚洲精品成人无码一区二区三区 | 日韩无码专区一区二区三区 | 波多野结衣边做饭边被躁 | 28—20岁女人一级毛片 | 无遮挡三级伦在线观看hd |