a级毛片无码久久精品免费_柠檬福利第一导航在线_广东少妇大战黑人34厘米视频_色噜噜狠狠综曰曰曰

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Usage and installation steps of hydraulic lifting platform

Source: Time:2020-03-14 09:02:33 views:

Usage and installation steps of hydraulic lifting platform

The usage method and installation steps of the 1137 hydraulic lifting platform. There are many details to pay attention to when using the hydraulic lifting platform. The following mainly discusses the installation steps of the hydraulic lifting platform:

1、 Compilation basis: Based on the user manual of the guide rail elevator, construction organization design, and on-site geological conditions.

2、 Preparation work before construction: (1) Inspect the work site for pits, ditches, hidden ditches, and holes, and check for high-voltage and communication lines above. If the above phenomena occur, take support measures. (2) Check for any obstacles on the entrance and exit roads. (3) The tools, toolboxes, rigging, rope buckles, safety helmets, safety belts, and other items used by various trades participating in the installation and dismantling of elevators (c ā n ji ā) shall be transported to the work site for backup.

3、 Foundation: The aluminum (Al) alloy elevator foundation has been processed by the civil construction unit (ch ǔ l ǐ).

4、 Basic requirements for safe operation: (1) Personnel involved in installation and dismantling must be familiar with the mechanical performance and structural characteristics of the elevator, and possess proficient operation and control techniques as well as the ability to troubleshoot general faults. (2) The workers involved in this work should have clear division of labor, each responsible for their own duties, with one person designated to direct the work and establish communication signals. (3) Adhere to all disciplines established to ensure safe production, carry complete safety equipment, and ensure that personnel working at heights meet the relevant regulations of the labor department. It is strictly prohibited to work under the influence of alcohol. (4) In the event of snow, rain, heavy fog, or weather with wind speeds exceeding 13 meters per second, this operation shall not be carried out. (5) The transformer power grid at the construction site shall have a transformer capacity of not less than 100KVA.

5、 Inspection after installation: (1) Recheck whether each fastening point meets the requirements, and tighten if there is any looseness. (2) Check if all components are complete and in effective condition.

6、 Installation completed:

(1) The trial operation of the crane includes trial operation, static load test, and dynamic load operation. Before the previous step is qualified, the next step of trial operation cannot be carried out. ?

(2) Clean the tools, rigging, equipment (sh è b è i), and debris on the construction site.

(3) Personnel and equipment exit the site.

{10}

Links

国产性猛交普通话对白 | 亚洲色图偷拍自拍 | 四川少妇露脸69式在线观看 | 久久人妻少妇嫩草av蜜桃麻豆 | 无高清人妻一区二区 | 国产成人久久精品麻豆二区 | 国产精品无码一区二区三区观看 | 成人一区二区在线观看 | 欧美爆乳猛交系列 | 国产又粗又大又爽又黄的视频 | caoporn12超碰电影蜜桃 | 色欲一区二区三区精品A片 国产三级精品三级在线观看 | A片试看50分钟做受视频 | 久久久久久久久久成人永久免费视频 | 久久精品A级毛片 | 成人精品一区二区三区不卡 | 人人操人人爽高潮喷水 | 国产a一级毛片爽爽影院无码 | 国产av一区二区三区 | 91丝袜制服诱惑 | 风流老熟女区二区三区 | 搡BBBB搡BBB搡视频一级看 | 亚洲无码精品专区在线观看 | 日本人做爰毛片免费播 | 日本熟女伦乱视频 | 国产在线视频一区 | 黄色网址在线观看视频 | 日韩A片一级无码免费 蜜桃 | 日韩精品无码一区二区 | 东京热加勒比HEZYO蜜臀麻豆 | 朝桐光AV一区二区三区 | 超碰人人超人人爽 | 交AAA免费视频| 在线观看一区二区三区不卡 | 亚洲成人无码AV一区二区三区 | 人妻精品久久久久中文字幕69 | 日韩亚洲中文一区 | 人妻哺乳奶头奶水XXXX | 日韩精品一卡二卡 | 欧一美一性一交一乱一伧图片 | 337p粉嫩大胆色噜噜噜噜 |