a级毛片无码久久精品免费_柠檬福利第一导航在线_广东少妇大战黑人34厘米视频_色噜噜狠狠综曰曰曰

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Usage and installation steps of hydraulic lifting platform

Source: Time:2020-03-14 09:02:33 views:

Usage and installation steps of hydraulic lifting platform

The usage method and installation steps of the 1137 hydraulic lifting platform. There are many details to pay attention to when using the hydraulic lifting platform. The following mainly discusses the installation steps of the hydraulic lifting platform:

1、 Compilation basis: Based on the user manual of the guide rail elevator, construction organization design, and on-site geological conditions.

2、 Preparation work before construction: (1) Inspect the work site for pits, ditches, hidden ditches, and holes, and check for high-voltage and communication lines above. If the above phenomena occur, take support measures. (2) Check for any obstacles on the entrance and exit roads. (3) The tools, toolboxes, rigging, rope buckles, safety helmets, safety belts, and other items used by various trades participating in the installation and dismantling of elevators (c ā n ji ā) shall be transported to the work site for backup.

3、 Foundation: The aluminum (Al) alloy elevator foundation has been processed by the civil construction unit (ch ǔ l ǐ).

4、 Basic requirements for safe operation: (1) Personnel involved in installation and dismantling must be familiar with the mechanical performance and structural characteristics of the elevator, and possess proficient operation and control techniques as well as the ability to troubleshoot general faults. (2) The workers involved in this work should have clear division of labor, each responsible for their own duties, with one person designated to direct the work and establish communication signals. (3) Adhere to all disciplines established to ensure safe production, carry complete safety equipment, and ensure that personnel working at heights meet the relevant regulations of the labor department. It is strictly prohibited to work under the influence of alcohol. (4) In the event of snow, rain, heavy fog, or weather with wind speeds exceeding 13 meters per second, this operation shall not be carried out. (5) The transformer power grid at the construction site shall have a transformer capacity of not less than 100KVA.

5、 Inspection after installation: (1) Recheck whether each fastening point meets the requirements, and tighten if there is any looseness. (2) Check if all components are complete and in effective condition.

6、 Installation completed:

(1) The trial operation of the crane includes trial operation, static load test, and dynamic load operation. Before the previous step is qualified, the next step of trial operation cannot be carried out. ?

(2) Clean the tools, rigging, equipment (sh è b è i), and debris on the construction site.

(3) Personnel and equipment exit the site.

{10}

Links

国产色情老熟女午夜啪咻视频网站 | 先锋影音在线资源 | 亚洲色图偷拍自拍 | 91麻豆精品国产理伦片在线观看 | 黄色免费网站在线观看 | 国产av亚洲av | 三亚三色黄A片免费看 | 91在线免费视频 | 精品人妻一区二区三区蜜桃 | 亚洲无码2021 | 欧美激情精品久久久久久免费 | 影音先锋av在线观看 | 国产精品一区二区久久乐夜夜嗨 | 国产精品夜夜爽7777777 | 中文字幕一级AV片 | 园产精品久久久久无码 | 在线观看黄色视频网站在线 | 性行为视频一级录像免费 | 48尤物被操在线观看视频 | 亚洲天堂高清无码在线观看 | 成人草久免费观看网站 | 韩国婬片内谢A片AAA毛 | 婷婷涩嫩草鲁丝久久午夜精品 | 国产精品人成无码免费A片芒果乱 | 你懂的网址在线观看大全视频在线 | 26UUU精品一区二区cOm新 | 一区二区三区久久 | 成 人 免费 黄 色 视 频 | 欧美日韩人妻精品 | 久久人妻少妇嫩草AV蜜桃漫画 | 中国免费黄色网页面 | 欧美一区二区在线观看视频 | 国内精品久久久久无码 | 中国宾馆推油按摩肏屄 | 婬乱丰满熟妇在线播放 | 久久久91人妻无码品蜜桃 | 嫩BBB揉BBBB揉BBBB | 在线观看黄色视频网站 | 台湾成人做爰A片免费看 | 江苏妇搡BBBB搡BBBB | 3级生活片1级片黄色生活片1级片 |